PIER 2 EXPANSION, North Harbor, Port of Manila (1990 – 1992)
Construction of the extension to the existing pier 2 which consist of the following; supply, delivery and driving of 0.50 m x 0.50m RC piles of varing length; Installation of reinforced concrete girders; casting, supply, delivery, installation of prestressed concrete slab; concrete topping of slab; installation of dock fenders, mooring, bollards and bits.