MANILA SOUTH HARBOR CONTAINER YARD DEVELOPMENT PROJECT, CONTAINER YARD EXTENSION, PHASE 5-A, Estampador Area, Pier 15, South Harbor, Manila (December 2000 – March 2001)
The works includes the demolition and general site clearance, vibro replacement with stone columns, subbase, base course with C-10 concrete, depth is 600mm with cut-back asphalt, concrete block, sand bedding for concrete blocks in situ concrete and electrical lighting.